SWS values Customer Focus, Teamwork, Innovation, Mutual Trusts and People Oriented to accomplish Win-Win with customers and employees. In partnership with global shipping & shipbuilding and oil & gas industries, SWS offer considerable expertise with timely deliveries and high quality and further enhance and contribute to the superior worldwide reputation.
Since established in 1999, SWS have completed three FPSOs, and one semi rig is under construction. Currently SWS Offshore Department has employees up to 250, of which critical personnel have been involved in previous three FPSO projects, covering business scopes from project management, engineering and design, procurement, HSE, QA/QC, planning, construction to commissioning.
The engineering team have engineerings of 150, in charge of detail design, shop design, workmanship development and technical research, using design software of Tribon M2, AutoCAD, PDMS.
FPSO
FPSO(floating production storage offloading unit) is one of key facilities for offshore oil exploration and development, with characteristics of high-risk, high-tech, high value-added.
Major Products
"HAI YANG SHI YOU 111" in-dock erection completed 2002-11-25
"HAI YANG SHI YOU 111" launching 2003-5-28
"HAI YANG SHI YOU 113" quayside commissioning
"HAI YANG SHI YOU 113" FPSO first oil 2004-8-28
"HAI YANG SHI YOU 117" in-dock erection 2006-6-26
"HAI YANG SHI YOU 117" in-dock erection complete 2006-10-24
"HAI YANG SHI YOU 117" launching 2006-12-8
semi rig
SWS was awarded by CNOOC on Oct. 18, 2007 to build one 6th Gen. Semi-submersible drilling unit "Hai Yang Shi You 981", which is one of key national "863" Programs and is the first DPS-3 deepwater semi rig ever built in China.
This rig is capable of operating in South China Sea,West Africa and South East Asia, with drilling depth up to 10000m and operating water depth up to 3000m, classed ABS and CCS.
Major Products
"HAI YANG SHI YOU 981" semi rig
"Hai Yang Shi You 981" Deepwater Semi Rig Mechanical Completion 2010-6-10
"Hai Yang Shi You 981" Deepwater Semi Rig LAUNCHING 2010-2-26
"Hai Yang Shi You 981" Deepwater Semi Rig indock Outfitting 2010-2-20
"HAI YANG SHI YOU 981"in-dock constuction (09-11-16)
"HAI YANG SHI YOU 981"in-dock erection (09-8-7)
"HAI YANG SHI YOU 981"in-dock erection (09-7-31)
"HAI YANG SHI YOU 981"in-dock erection (09-7-21)
"HAI YANG SHI YOU 981"in-dock erection (09-6-26)
"HAI YANG SHI YOU 981"in-dock erection (09-5-20)
"HAI YANG SHI YOU 981"in-dock erection (09-4-21)
二. Performance Record:
|
Client |
Vessel Name |
Contract Award |
Type |
Dimensions (L*B*H) |
Completion |
|---|---|---|---|---|---|
|
CNOOC |
HaiYangShiYou 111 |
2002.1 |
1million bbl FPSO |
262m/46m/17.1m |
2003.7 |
|
CNOOC |
HaiYangShiYou 113 |
2002.12 |
1.2million bbl FPSO |
287m/51m/14.5m |
2004.7 |
|
ConocoPhillips |
HaiYangShiYou 117 |
2005.3.1 |
2million bbl FPSO |
313m/63m/20.8m |
2007.5 |
|
CNOOC |
HaiYangShiYou 981 |
2007.10 |
6th Gen. DP3 Deepwater Semi Rig |
114m/78m/8.2m |
2010.12 |






